Jump to the main content block

SDG 14.5.5

SDG 14.5.5 Watershed management strategy

1. All wastewater on campus would first be handled centrally at the wastewater treatment, after that, the effluent is discharged through the discharge outlet registered by NCUE.

All the treatments are in accordance with the Water Pollution Control Act and the Enforcement Rules of the Water Pollution Control Act.

Link to Water Pollution Control Act: https://law.moj.gov.tw/LawClass/LawAll.aspx?media=print&pcode=O0040001

Link to Enforcement Rules of the Water Pollution Control Act. Link to Water Pollution Control Act: https://law.moj.gov.tw/LawClass/LawAll.aspx?media=print&pcode=O004000 (A screenshot of the regulation is shown in Figure 1.) Regarding water quality testing results and periodic report, NCUE follows the reporting schedule below: in July each year, NCUE submits data for the period from January to June of that year; in January of following year, it submits data for the period from July to December of the previous year.

Figure 1. Relevant national regulations and standards (Part 1)
Figure 1. Relevant national regulations and standards (Part 2)
Figure 1. Relevant national regulations and standards

2. NCUE submits the required information through the Ministry of Environment’s Wastewater Management System for Enterprises and Sewerage Systems. A screenshot of NCUE’s reporting page is shown in Figure 2.

Figure 2. A screenshot of the “Wastewater Management System for Industrial and Sewage Systems” webpage of the Ministry of Environment
Figure 2. A screenshot of the “Wastewater Management System for Industrial and Sewage Systems” webpage of the Ministry of Environment

3. Figure 3-6 Photograph of a Wastewater Treatment Plant.

Figure 3-4 Wastewater Treatment Plant on Jinde Campus (Photo 1)
Figure 3-4 Wastewater Treatment Plant on Jinde Campus (Photo 2)
Figure 3-4 Wastewater Treatment Plant on Jinde Campus
Figure 5-6 Wastewater Treatment Plant on Shida Campus (Photo 1)
Figure 5-6 Wastewater Treatment Plant on Shida Campus (Photo 2)
Figure 5-6 Wastewater Treatment Plant on Shida Campus

4. In accordance with the Water Pollution Control Act, NCUE conducts an annual calibration of the effluent flow meter at its wastewater treatment plant. Figures 7-8 present the flow meter calibration and verification reports issued by an inspection agency accredited by the Ministry of Environment for the University’s wastewater treatment plant effluent.

Figure 7. Wastewater Treatment Plant Effluent Flow Meter Calibration Report of NCUE (Page 1)
Figure 7. Wastewater Treatment Plant Effluent Flow Meter Calibration Report of NCUE (Page 1)
Figure 8. Wastewater Treatment Plant Effluent Flow Meter Calibration Report of NCUE (Page 2)
Figure 8. Wastewater Treatment Plant Effluent Flow Meter Calibration Report of NCUE (Page 2)

5. In accordance with the Water Pollution Control Act and Waste Disposal Act, sludge removal and treatment operations are conducted every two years, as illustrated in Figures 9–10.

Figures 9. Sludge Removal and Treatment Operations on Jinde Campus (Photo 1)
Figures 9. Sludge Removal and Treatment Operations on Jinde Campus (Photo 2)
Figures 9. Sludge Removal and Treatment Operations on Jinde Campus
Figures 10. Sludge Removal and Treatment Operations on Shida Campus (Photo 1)
Figures 10. Sludge Removal and Treatment Operations on Shida Campus (Photo 2)
Figures 10. Sludge Removal and Treatment Operations on Shida Campus.
Click Num: