Jump to the main content block

NCUE_Logo  National Changhua University of Education Sustainable Development Goals, SDGs 

SDG12.4.1 Publication of a sustainability report-2021

1. On 29 September 2020, in the presence of members of the Occupational Safety and Health Committee, the President of NCUE signed the ‘Protection and Occupational Safety and Health Policy of National Changhua University of Education’. It specifies the following: to build a sustainable and green university, faculty, staff, and students at NCUE should fully comply with the relevant laws and regulations, participate in educational programmes, maintain campus security, prevent accidents, cherish the environmental resources, act on energy conservation and carbon reduction, and commit to pollution prevention and continuous improvement. As a member of the global village, everyone should fulfil their responsibilities to build an ecological campus free of accidents and pollution.

Please refer to appendix 12.4.1A-Protection and Occupational Safety and Health Policy, as well as the Centre of Protection and Occupational Safety and Health’s website for posting laws, regulations, and rules applying to faculty and staff:

http://webadmin.ncue.edu.tw/el/ploy/UploadFiles/934/File/%E7%92%B0%E5%AE%89%E8%A1%9B%E6%94%BF%E7%AD%96%28%E6%96%B0%E7%89%88%29%5B1272%5D.pdf

NCUE President signing the ‘Protection and Occupational Safety and Health Policy of National Changhua University of EducationNCUE President signing the ‘Protection and Occupational Safety and Health Policy of National Changhua University of EducationNCUE President signing the ‘Protection and Occupational Safety and Health Policy of National Changhua University of Education

NCUE President signing the ‘Protection and Occupational Safety and Health Policy of National Changhua University of Education’.

Protection and Occupational Safety and Health Policy of National Changhua University of Education.

Protection and Occupational Safety and Health Policy of National Changhua University of Education.

2. In response to relevant national policies, NCUE will complete the addition of solar photovoltaic panels on the roof of each building of NCUE by the end of July 2022, with a total capacity of 1,888.5 kW for Jin-De Campus and 731.25 kW for Bao-Shan Campus. In addition to reducing the net load of the buildings, in some scenarios (such as off-peak months) the building can be fully dependent on solar photovoltaic electricity. Given the reduced electricity current of the distribution lines, line loss can be reduced by about 3% and energy efficiency can be improved. Moreover, solar panels can block direct sunlight from the roof. According to research data, they can reduce the heat energy of direct sunlight on the roof by 38% and reduce the temperature of the roof by 2.8°C. With the building’s improved overall temperature environment, air conditioning use can be reduced to improve energy efficiency. The planning and design drawings (partial) of the building’s rooftop solar photovoltaic panels in Jin-De Campus and Bao-Shan Campus in 2021-2022 is shown in Appendix 12.4.1B-Rooftop Solar Photovoltaic Building Panels Planning and Drawings in Jin-De and Bao-Shan.

Campus

Building name

Estimated capacity of the installation (kWp)

Total

Estimated electricity generation (kWh/year)

Total

Jin-De Campus

Qiao Si Building

157.5

1888.5

kWp

196,875

2,360,626

kWh

Hong Dao Building

118.125

147,656

Bai Sha Building

251.25

314,063

Zhi Shan Building

48

60,000

Ming De Building

64.125

80,156

Teaching Building

96.375

120,469

Eighth Dorm

199.5

249,375

Seventh Dorm

181.5

226,875

Sixth Dorm

88.5

110,625

Hu Bin Building

123

153,750

Library

133.5

166,875

Comprehensive Centre

115.5

144,375

Canteen

212.25

265,313

Sheng Yang Building

99.375

124,219

Bao-Shan Campus

Ninth Dorm

100.5

731.25 kWp

125,625

914,063

kWh

Tenth Dorm

127.5

159,375

First Teaching Building

101.25

126,563

Second Teaching Building

College of Engineering Building

139.5

174,375

Jing Shi Building

114.375

142,969

Li Xing Building

148.125

185,156

Dormitory mapDormitory map

Appendices (including supporting documents):

  • Annex 12.4.1A-Protection and Occupational Safety and Health Policy (latest version)
  • Annex 12.4.1B-Rooftop Solar Photovoltaic Building Panels Planning and Drawings in Jin-De and Bao-Shan.



Responsible Consumption and production

Click Num: