Jump to the main content block
LOGO2024

SDG 14.5.5 Watershed management strategy

1. NCUE manages all generated effluent by routing it through a centralized wastewater treatment plant. The treated water is then discharged through outlets approved and regulated by the authorities. The university complies with the regulations outlined in the Water Pollution Control Act (Link https://law.moj.gov.tw/LawClass/LawAll.aspx?media=print&pcode=O0040001) and Water Pollution Control Act Enforcement Rules (Link https://law.moj.gov.tw/LawClass/LawAll.aspx?media=print&pcode=O0040002) in handling and reporting the discharge of wastewater. Every year in July, the University submits a report that includes the water quality testing results for both the raw wastewater and the discharged wastewater for the period from January to June of the current year. Additionally, in the following year, by January, the University submits a report that covers the water quality testing results for both the raw wastewater and the discharged wastewater for the period from July to December of the preceding year.

The following is a screenshot of NCUE’s reporting on the webpage of the “Waste/Polluted Water Management System for Industrial and Sewage Systems” (WPMIS) of the Ministry of Environment as shown in Figure 1:

Wastewater Management System for Industrial and Sewage Systems

Figure 1 is a screenshot of the “Wastewater Management System for Industrial and Sewage Systems” webpage of the Ministry of Environment

2. The photos of the wastewater treatment plant are shown in Figure 2-3.

Jinde Campus Wastewater Treatment Plant

Figure 2. Jinde Campus Wastewater Treatment Plant

Baoshan Campus Wastewater Treatment Plant

Figure 3. Baoshan Campus Wastewater Treatment Plant

3. The Water Pollution Control Act requires annual calibration of the water meter for the effluent of the school’s wastewater treatment plant. The following Figure 4 and Figure 5 show the calibration and correction report of the school’s wastewater treatment plant effluent water meter issued by an inspection institution accredited by the Ministry of Environment.

Calibration report of the water meter of NCUE’s wastewater treatment plant effluent water meter

Figure 4. Calibration report of the water meter of NCUE’s wastewater treatment plant effluent water meter (Page 1)

Calibration report of the water meter of NCUE’s wastewater treatment plant effluent water meter

Figure 5. Calibration report of the water meter of NCUE’s wastewater treatment plant effluent water meter (Page 2)

4. In accordance with the Water Pollution Control Act and Waste Disposal Act, the sludge removal and treatment operations have been carried out as required, Related photos as shown in Figure 6-7.

Sludge removal and treatment at Jinde Campus of NCUE

Figure 6. Sludge removal and treatment at Jinde Campus of NCUE

Sludge removal and treatment in Baoshan Campus of NCUE

Figure 7. Sludge removal and treatment in Baoshan Campus of NCUE

5. According to the Water Pollution Prevention and Control Act, water quality inspection is conducted once every six months, and the relevant photos are shown in Figure 8-9.

Water quality inspection at Jinde Campus

Figure 8. Water quality inspection at Jinde Campus

Water quality inspection at Baoshan Campus

Figure 9. Water quality inspection at Baoshan Campus

Click Num: