1. NCUE manages all generated effluent by routing it through a centralized wastewater treatment plant. The treated water is then discharged through outlets approved and regulated by the authorities. The university complies with the regulations outlined in the Water Pollution Control Act (Link  https://law.moj.gov.tw/LawClass/LawAll.aspx?media=print&pcode=O0040001 ) and Water Pollution Control Act Enforcement Rules (Link  https://law.moj.gov.tw/LawClass/LawAll.aspx?media=print&pcode=O0040002 ) in handling and reporting the discharge of wastewater. Every year in July, NCUE submits a report that includes the water quality testing results for both the raw wastewater and the discharged wastewater for the period from January to June of the current year. Additionally, in the following year, by January, NCUE submits a report that covers the water quality testing results for both the raw wastewater and the discharged wastewater for the period from July to December of the preceding year.

The following is a screenshot of NCUE’s reports on the webpage of the “Waste/Polluted Water Management System for Businesses and Sewage Systems” (WPMIS) of the Ministry of Environment as shown in Figure 1:

Figure 1. Screenshot of the “Wastewater Management System for Industrial and Sewerage Systems” webpage of the Ministry of Environment.

Figure 1. Screenshot of the “Wastewater Management System for Industrial and Sewerage Systems” webpage of the Ministry of Environment.

2. The photos of the wastewater treatment plant are shown in Figure 2-5.

Figure 2. Jinde Campus Wastewater Treatment Plant

Figure 2. Jinde Campus Wastewater Treatment Plant

Figure 3. Jinde Campus Wastewater Treatment Plant

Figure 3. Jinde Campus Wastewater Treatment Plant

Figure 4. Baoshan Campus Wastewater Treatment Plant

Figure 4. Baoshan Campus Wastewater Treatment Plant

Figure 5. Baoshan Campus Wastewater Treatment Plant

Figure 5. Baoshan Campus Wastewater Treatment Plant

3. The Water Pollution Control Act requires annual calibration of the water meter for the effluent of the school's wastewater treatment plant. Figure 6 and Figure 7 show the calibration and correction report of NCUE's wastewater treatment plant effluent water meter issued by an inspection institution accredited by the Ministry of Environment.

Figure 6. Calibration report of the water meter of NCUE's wastewater treatment plant effluent water meter

Figure 6. Calibration report of the water meter of NCUE's wastewater treatment plant effluent water meter (Page 1)

Figure 7. Calibration report of the water meter of NCUE's wastewater treatment plant effluent water meter

Figure 7. Calibration report of the water meter of NCUE's wastewater treatment plant effluent water meter (Page 2)

4. In accordance with the Water Pollution Control Act and Waste Disposal Act, the sludge removal and treatment operations have been carried out as required. Relevant photos are as shown in Figures 8-11.

Figure 8. Sludge removal and treatment on Jinde Campus of NCUE

Figure 8. Sludge removal and treatment on Jinde Campus of NCUE

Figure 9. Sludge removal and treatment on Jinde Campus of NCUE

Figure 9. Sludge removal and treatment on Jinde Campus of NCUE

Figure 10. Sludge removal and treatment on Baoshan Campus of NCUE

Figure 10. Sludge removal and treatment on Baoshan Campus of NCUE

Figure 11. Sludge removal and treatment on Baoshan Campus of NCUE

Figure 11. Sludge removal and treatment on Baoshan Campus of NCUE

5. According to the Water Pollution Prevention and Control Act, water quality inspection is conducted once every six months. Relevant photos are as shown in Figures 12-15.

Figure 12. Water quality inspection on Jinde Campus

Figure 12. Water quality inspection on Jinde Campus

Figure 13. Water quality inspection on Jinde Campus

Figure 13. Water quality inspection on Jinde Campus

Figure 14. Water quality inspection on Baoshan Campus

Figure 14. Water quality inspection on Baoshan Campus

Figure 15. Water quality inspection on Baoshan Campus

Figure 15. Water quality inspection on Baoshan Campus

6. In 2024, the variety of operations of wastewater treatment plants on both campuses, including water quality inspection and regular reporting all passed the examination.