SDG 14.5.5 Watershed management strategy

1. NCUE manages all generated effluent by routing it through a centralized wastewater treatment plant. The treated water is then discharged through outlets approved and regulated by the authorities. The university complies with the regulations outlined in the Water Pollution Control Act (Link https://law.moj.gov.tw/LawClass/LawAll.aspx?media=print&pcode=O0040001 ) and Water Pollution Control Act Enforcement Rules (Link https://law.moj.gov.tw/LawClass/LawAll.aspx?media=print&pcode=O0040002 ) in handling and reporting the discharge of its wastewater. Every year in July, the University submits a report that includes the water quality testing results for both the raw wastewater and the discharged wastewater for the period from January to June of the current year. Additionally, in the following year, by January, the University submits a report that covers the water quality testing results for both the raw wastewater and the discharged wastewater for the period from July to December of the preceding year.

The following is a screenshot of NCUE’s reporting on the webpage of the “Waste/Polluted Water Management System for Industrial and Sewage Systems” (WPMIS) of the Ministry of Environment as shown in Figure 1.

Figure1

Figure 1. The screenshot of the “Wastewater Management System for Industrial and Sewage Systems” webpage of the Ministry of Environment

2. The photos of the wastewater treatment plant are shown in Figure 2-5.

Figure2   Figure3

Figure 2-3. Jinde Campus Wastewater Treatment Plant

Figure4   Figure5

Figure 4-5. Baoshan Campus Wastewater Treatment Plant

3. The Water Pollution Control Act requires annual calibration of the water meter for the effluent of the school’s wastewater treatment plant. The following Figure 6 and Figure 7 show the calibration and correction report of the school’s wastewater treatment plant effluent water meter issued by an inspection institution accredited by the Ministry of Environment.

Figure6

Figure 6. Calibration report of the water meter of NCUE’s wastewater treatment plant effluent water meter (Page 1)

Figure7

Figure 7. Calibration report of the water meter of NCUE’s wastewater treatment plant (Page 2)

4. In accordance with the Water Pollution Control Act and Waste Disposal Act, the sludge removal and treatment operations have to be carried out as required every two years, Related photos as shown in Figure 8-11.

Figure8   Figure9

Figure 8-9. Sludge removal and treatment at Jinde Campus

Figure10   Figure11

Figure 10-11. Sludge removal and treatment at Baoshan Campus

5. According to the Water Pollution Prevention and Control Act, water quality inspections have to be conducted once every six months, and the relevant photos are shown in Figures 12-15.

Figure12   Figure13

Figure 12-13. Water quality inspection at Jinde Campus

Figure14   Figure15

Figure 14-15. Water quality inspection at Baoshan Campus

6. In 2024, the variety of operations of wastewater treatment plants on both campuses, including water quality inspection and regular reporting all passed the examination.