SDG13.2.2 Total energy used-2021

1. NCUE’s Jin-De Campus has installed a solar photovoltaic power generation system with a total power generation of 579,960 kWh in 2020, and a cumulative total power generation of 2,046,300 kWh = 7366.6 GJ by 2020.

2. It is estimated that in 2021-2022, Jin-De Campus will add 2,360,626 kWh (8,498.25 GJ) of electricity generation from solar energy annually, and Bao-Shan Campus will add 914,063 kWh (3,290.63 GJ).

3. According to the current plan, in 2023–2024, Jin-De Campus will add 1,203,600 kWh (4,332.96 GJ) of electricity generation from solar energy annually, and Bao-Shan Campus will add 2,036,775 kWh (7,332.39 GJ).

4. It is expected that NCUE’s total solar power generation will reach 7,095,024 kWh (25,542.09 GJ) by 2024, which is more than 50% of its total electricity consumption in 2020.

The following is the master planning table of NCUE’s additional solar power capacity from 2021 to 2024.

Campus

Year

 Additional capacity (kWp) 

 Cumulative installed capacity (kWp) 

 Cumulative annual electricity generation (kWh) 

Jin-De Campus

Before 2020

467

467

579,960

 

2021–2022

1888.5

2355.5

2,940,586

 

2022–2024

962.88

3,318.38

4,144,186

Bao-Shan Campus

Before 2020

0

0

0

 

2021–2022

731.25

731.25

914,063

 

2022–2024

1629

2360.25

2,950,838

 

The following is the breakdown of additional solar power capacity by NCUE building from 2021 to 2022:

Campus

Building name

 Estimated capacity of the installation (kWp) 

Total

 Estimated electricity generation (kWh/year) 

Total

Jin-De Campus

Qiao Si Building

157.5

1888.5

kWp

196,875

2,360,626

kWh

Hong Dao Building

118.125

147,656

Bai Sha Building

251.25

314,063

Zhi Shan Building

48

60,000

Ming De Building

64.125

80,156

Teaching Building

96.375

120,469

Eighth Dorm

199.5

249,375

Seventh Dorm

181.5

226,875

Sixth Dorm

88.5

110,625

Hu Bin Building

123

153,750

Library

133.5

166,875

Comprehensive Centre

115.5

144,375

Canteen

212.25

265,313

Sheng Yang Building

99.375

124,219

Bao-Shan Campus

Ninth Dorm

100.5

731.25 kWp

125,625

914,063

kWh

Tenth Dorm

127.5

159,375

First Teaching Building

101.25

126,563

Second Teaching Building

College of Engineering Building

139.5

174,375

Jing Shi Building

114.375

142,969

Li Xing Building

148.125

185,156

 

The following is the breakdown of additional solar power capacity by NCUE building from 2023 to 2024

Campus

Location of installation

 Estimated capacity of the installation (kWp) 

Total

 Estimated electricity generation (kWh/year) 

Total

Jin-De Campus

Stands around the stadium

112.2

Provisional estimate

962.88

kWp

140,250

1,203,600

kWh

Roof of the substation for the stadium

Old activity centre

134.3

167,875

Wang Jin-pyng Activity Centre

99.96

124,950

Wang Jin-pyng Swimming Pool

226.1

282,625

East entrance’s motorcycle parking lot

98.6

123,250

Car parking lot in front of Yi Hui Building

291.72

364,650

West entrance’s motorcycle parking lot

Car parking lot for the Family Quarters

Bao-Shan Campus

Car parking lot for Yu Cheng Centre

107.1

Provisional estimate: 1,629

kWp

133,875

2,036,775

kWh

Before the Tenth Dorm

283.56

354,450

Behind the Ninth Dorm

134.64

168,300

Car parking lot 1, by the side of Bao-Shan Road

116.62

145,775

Car parking lot 2, by the side of Bao-Shan Road

109.14

136,425

Car parking lot for the Second Teaching Building

93.84

117,300

Car parking lot above the Bao-Shan Tennis Court

62.22

77,775

Back alley of the Sewage Treatment Plant

104.04

130,050

Motorcycle parking lot behind the Li Xing Building

121.38

151725

Car parking lot by the side of Bao-Shan Road for the First Teaching Building

91.8

114,750

Behind the Second Jing Shi Building

55.08

68,850

Covered playground

340

425,000

Bao-Shan Sewage Treatment Plant

10

12,500