SDG13.2.2 Total energy used-2021
1. NCUE’s Jin-De Campus has installed a solar photovoltaic power generation system with a total power generation of 579,960 kWh in 2020, and a cumulative total power generation of 2,046,300 kWh = 7366.6 GJ by 2020.
2. It is estimated that in 2021-2022, Jin-De Campus will add 2,360,626 kWh (8,498.25 GJ) of electricity generation from solar energy annually, and Bao-Shan Campus will add 914,063 kWh (3,290.63 GJ).
3. According to the current plan, in 2023–2024, Jin-De Campus will add 1,203,600 kWh (4,332.96 GJ) of electricity generation from solar energy annually, and Bao-Shan Campus will add 2,036,775 kWh (7,332.39 GJ).
4. It is expected that NCUE’s total solar power generation will reach 7,095,024 kWh (25,542.09 GJ) by 2024, which is more than 50% of its total electricity consumption in 2020.
The following is the master planning table of NCUE’s additional solar power capacity from 2021 to 2024.
Campus |
Year |
Additional capacity (kWp) |
Cumulative installed capacity (kWp) |
Cumulative annual electricity generation (kWh) |
Jin-De Campus |
Before 2020 |
467 |
467 |
579,960 |
|
2021–2022 |
1888.5 |
2355.5 |
2,940,586 |
|
2022–2024 |
962.88 |
3,318.38 |
4,144,186 |
Bao-Shan Campus |
Before 2020 |
0 |
0 |
0 |
|
2021–2022 |
731.25 |
731.25 |
914,063 |
|
2022–2024 |
1629 |
2360.25 |
2,950,838 |
The following is the breakdown of additional solar power capacity by NCUE building from 2021 to 2022:
Campus |
Building name |
Estimated capacity of the installation (kWp) |
Total |
Estimated electricity generation (kWh/year) |
Total |
Jin-De Campus |
Qiao Si Building |
157.5 |
1888.5 kWp |
196,875 |
2,360,626 kWh |
Hong Dao Building |
118.125 |
147,656 |
|||
Bai Sha Building |
251.25 |
314,063 |
|||
Zhi Shan Building |
48 |
60,000 |
|||
Ming De Building |
64.125 |
80,156 |
|||
Teaching Building |
96.375 |
120,469 |
|||
Eighth Dorm |
199.5 |
249,375 |
|||
Seventh Dorm |
181.5 |
226,875 |
|||
Sixth Dorm |
88.5 |
110,625 |
|||
Hu Bin Building |
123 |
153,750 |
|||
Library |
133.5 |
166,875 |
|||
Comprehensive Centre |
115.5 |
144,375 |
|||
Canteen |
212.25 |
265,313 |
|||
Sheng Yang Building |
99.375 |
124,219 |
|||
Bao-Shan Campus |
Ninth Dorm |
100.5 |
731.25 kWp |
125,625 |
914,063 kWh |
Tenth Dorm |
127.5 |
159,375 |
|||
First Teaching Building |
101.25 |
126,563 |
|||
Second Teaching Building |
|||||
College of Engineering Building |
139.5 |
174,375 |
|||
Jing Shi Building |
114.375 |
142,969 |
|||
Li Xing Building |
148.125 |
185,156 |
The following is the breakdown of additional solar power capacity by NCUE building from 2023 to 2024
Campus |
Location of installation |
Estimated capacity of the installation (kWp) |
Total |
Estimated electricity generation (kWh/year) |
Total |
Jin-De Campus |
Stands around the stadium |
112.2 |
Provisional estimate 962.88 kWp |
140,250 |
1,203,600 kWh |
Roof of the substation for the stadium |
|||||
Old activity centre |
134.3 |
167,875 |
|||
Wang Jin-pyng Activity Centre |
99.96 |
124,950 |
|||
Wang Jin-pyng Swimming Pool |
226.1 |
282,625 |
|||
East entrance’s motorcycle parking lot |
98.6 |
123,250 |
|||
Car parking lot in front of Yi Hui Building |
291.72 |
364,650 |
|||
West entrance’s motorcycle parking lot |
|||||
Car parking lot for the Family Quarters |
|||||
Bao-Shan Campus |
Car parking lot for Yu Cheng Centre |
107.1 |
Provisional estimate: 1,629 kWp |
133,875 |
2,036,775 kWh |
Before the Tenth Dorm |
283.56 |
354,450 |
|||
Behind the Ninth Dorm |
134.64 |
168,300 |
|||
Car parking lot 1, by the side of Bao-Shan Road |
116.62 |
145,775 |
|||
Car parking lot 2, by the side of Bao-Shan Road |
109.14 |
136,425 |
|||
Car parking lot for the Second Teaching Building |
93.84 |
117,300 |
|||
Car parking lot above the Bao-Shan Tennis Court |
62.22 |
77,775 |
|||
Back alley of the Sewage Treatment Plant |
104.04 |
130,050 |
|||
Motorcycle parking lot behind the Li Xing Building |
121.38 |
151725 |
|||
Car parking lot by the side of Bao-Shan Road for the First Teaching Building |
91.8 |
114,750 |
|||
Behind the Second Jing Shi Building |
55.08 |
68,850 |
|||
Covered playground |
340 |
425,000 |
|||
Bao-Shan Sewage Treatment Plant |
10 |
12,500 |