SDG 14.5.5 Watershed management strategy
1. NCUE manages all generated effluent by routing it through a centralized wastewater treatment plant. The treated water is then discharged through outlets approved and regulated by the authorities. The university complies with the regulations outlined in the Water Pollution Control Act (Link: https://law.moj.gov.tw/LawClass/LawAll.aspx?media=print&pcode=O0040001) and Water Pollution Control Act Enforcement Rules (Link:
https://law.moj.gov.tw/LawClass/LawAll.aspx?media=print&pcode=O0040002) in handling and reporting the discharge of wastewater. Every year in July, the University submits a report that includes the water quality testing results for both the raw wastewater and the discharged wastewater for the period from January to June of the current year. Additionally, in the following year, by January, the University submits a report that covers the water quality testing results for both the raw wastewater and the discharged wastewater for the period from July to December of the preceding year.
2. The following is a screenshot of NCUE’s reporting on the webpage of the “Waste/Polluted Water Management System for Businesses and Sewage Systems” (WPMIS) of the Environmental Protection Administration (EPA), as shown in Figure 1:
|
Figure 1. Screenshot of the webpage of “Wastewater Management System for Industrial and Sewerage Systems” of the Environmental Protection Administration (EPA) |
Reporting Website (Environmental Management System of EPA): https://reurl.cc/p54RXe.
The maintenance photos of the wastewater treatment plant are shown in Figures 2-3.
|
|
Figure 2. Jinde Campus Wastewater Treatment Plan |
Figure 3. Baoshan Campus Wastewater Treatment Plant |
3. According to the regulations of the Water Pollution Control Act, it is legally required to perform an annual calibration operation on the water meter for the effluent of the school’s wastewater treatment plant. The following Figure 4 and Figure 5 show the calibration and correction report of the school’s wastewater treatment plant effluent water meter issued by an inspection institution accredited by the EPA.
|
Figure 4. Calibration report of the water meter of NCUE’s wastewater treatment plant effluent water meter (Page 1) |
|
Figure 5. Calibration report of the water meter of NCUE’s wastewater treatment plant effluent water meter (Page 2) |
4. Sludge removal and treatment operations have been carried out in accordance with the Water Pollution Control Act and Waste Disposal Act, related photos as shown in Figures 6-7.
|
Figure 6. Sludge removal and treatment at Jinde Campus |
|
Figure 7. Sludge removal and treatment at Baoshan Campus |
5. According to the Water Pollution Prevention and Control Law, water quality inspection is conducted once every six months, related photos as shown in Figures 8-9.
|
Figure 8. Water quality inspection at Jinde Campus |
|
Figure 9. Water quality inspection at Baoshan Campus |